2000t/d gold ore processing plant in South Africa

Contact us to get an on-site quotation for the equipment immediately .

Background

Zhongya Machinery has successfully provided a 2000t/d gold ore processing plant for South Africa. We designed the flow chart of the beneficiation plant and the layout of the plant according to the ore conditions, provided a full set of plant equipment, and sent Chinese engineers to the mine site to provide guidance on plant installation and commissioning.

Solutions

  • Crushing and screening stage: The process of three-stage crushing and screening with single closed-circuit stage was adopted.
  • Grinding and magnetic separation stage: The process of stage-grinding and stage-separation was adopted.
  • Concentrates dewatering stage: Magnetic concentrates were dewatered preliminarily by concentrated magnetic separator.
  • Tailings dewatering stage: The tailings were firstly processed by thickeners for the first-stage dewatering; after that, the underflow was transported by the slurry pump to hydrocyclone for classification.

Case Photos

Feedback

Zhongya Machinery has provided us with comprehensive technical support and complete production line equipment, including installation and commissioning of the equipment. This production line meets my requirements very well, and it has been running well from installation to now, which makes me feel very relieved, and I plan to continue to buy this beneficiation equipment in the new plant.